GISAXS @ D1


GISAXS set-up

First incarnation of a GISAXS set-up in D1 hutch in August 2004. From right to left: hutch slits, Itot ion chamber, manual incident beam slit si, flight path with shutter, monitor Imon, and guard slit sg, sample goniometer, and detector flight path.



sample holder

GISAXS sample holder and goniometer.


sample stage

G1 GISAXS sample stage visiting D-line (see also the Report by Smilgies in CHESS Newsletter 2004).


support

One picture to remind myself: support of sample stage.


beam stop

Beam stop, line-up ion chamber Idet, and Medoptics CCD camera (in beam direction, i.e. from right to left).


detectors

Line-up ion chamber Idet and Medoptics CCD detector with control computer in the back.

(Note: Although the GISAXS measurments are still done pretty much the same way, almost all components of the first generation GISAXS set-up have been replaced by now - DS, Aug. 2006)